vijayawada metro rail project route and stations

The dream of the metro of the city residents of Vijayawada will soon come true. The AP Metro Rail Corporation (APMRC), which has identified the need for 91 acres of land in NTR and Krishna districts for the construction of the metro corridor, recently met NTR District Collector G. Lakshmi and submitted proposals. Initially, it was planned to take up the construction of the Vijayawada Metro Rail in four corridors. However, the focus is currently on building two corridors from Gannavaram and Penamalur. Land acquisition will be done as per the proposals prepared earlier so that these two corridors meet at PNBS in Vijayawada.
The length of the first corridor is 26 kilometers. It starts from PNBS and connects Vijayawada Railway Station, passes through Eluru Road and reaches the national highway at Ramavarappadu and from there goes to Gannavaram. In this sequence, it travels via Yoga Ashram, Airport, Goodavalli, Chaitanya College, Nidamanur, MBT Center, Prasadampadu, Ramavarappadu intersections. After that, it turns onto Eluru Road and reaches Penmaluru via Gunadala, Padavala Revu, Machavaram Down, Sitarampuram Signal, Besant Road Railway Station.
The second corridor, which is 12.5 km long, starts from PNBS and goes via Bandaru Road, Benzi Circle, Auto Nagar, Kannur, Poranki to Penmaluru. In this sequence, PNBS passes through Bandaru Road, Victoria Museum, Indira Gandhi Stadium, Benzi Circle, Auto Nagar, Ashoka Nagar, Krishna Nagar, Kannur Center, Tadigadapa, Poranki to Penmaluru.

- Best solar system service provider in chittoor
- The investor is ready to invest ₹30–40 lakhs and is particularly interested in setting up a franchise
- The Union Cabinet has approved the doubling of the Tirupati–Pakala–Katpadi railway line, covering a distance of 104 km across
- Looking for a Home to Rent? Your Perfect Property Awaits!
- Open Plots Near Vasista School, Madanapalle

Leave a Reply
You must be logged in to post a comment.